Right. I know. Long time no hear. Still, I’ve got photos now! Woohoo!
I’ll catch up in a couple of posts I think – don’t want to make them too long. When I last showed pictures… Oh… Ages ago… We’d reached the stage where the old fire and surround had gone, but further destruction needed to be achieved before we could start to rebuild for the new stove.
As GG is demonstrating here, the best way to do that was with a crow bar and a large mallet. It was kind of fun, but also kind of dirty and hard work in places. After quite a lot of chipping and lifting out loose bricks and stuff, she’d revealed the back boiler.
This is it with no support other than the two copper pipes that went into the wall. The plumber who came to deal with the gas pipe was pretty adamant that it would have been disconnected when the central heating was put in, so GG went ahead and pulled it out.
Note the relatively small amount of extremely rusty water that came out of it. Looks like the plumber was right. Fortunately, or there could have been a bit of a mess! (If you’re getting the feeling that GG did a lot of the work on the fireplace, you’d be right. Obviously it was just that I had a lot of school work on, and not because she’s stronger than me. Obviously.)
The end of this phase of the development. The cleaned up fireplace. The gas pipe is now capped and ready to be lost under concrete. The dip in the floor is fully exposed, and the proper size of the opening is visible. So are a number of holes in the mortar in the brick around the fireplace, and the worrying amount of soot. Still, we had progressed. Next step, the rebuild… Plastering, rendering, floor-filling, tiling, painting… Tune in soon for the next exciting episode!




Leave a Reply