So, whoops, yeah, another year went. And boy hasn’t 2020 been a doozy of a year?! I swear it was February both a blink ago and simultaneously a lifetime ago.
Way back when in a previous life (probably around last November, but yeah), Clarkie spotted a jumper she wanted in the men’s section of Joe Brown’s catalogue. I’m pretty sure I’ve mentioned this before, but Clarkie much prefers men’s fashion but is 5’1″, so it all sort of drowns her. Plus at the price there was no way this jumper was going to be wool, so I offered to make her a version of her very own for her birthday.
Readers, her birthday is in March. The end of March, but yes, March. Still, November to March, plenty of time for an experienced knitter such as myself.
I even have evidence that I started it before the end of January.
That one in the bottom right, that’s about 2″ long. That’s the birthday jumper. Sitting on top of a printed copy of the catalogue picture. You can see the thing about this jumper that a) attracted Clarkie and b) absolutely wrecked my estimates in this tiny sliver of completed jumper.
It is 100% fisherman’s rib.
I couldn’t find a suitable pattern to work from, which has never really been a problem so I swatched and cast on. I soon realised that this jumper was eating yarn faster than I’d expected, and I hadn’t got the stretch right on my swatch. I ripped back. Reduced the number of stitches per inch. Went up a needle size. And restarted. The yarn was still being eaten at a much faster rate than I’d bargained for, but I continued bravely on.
What I was turning a blind eye to/neglecting to notice was that the row count was way, way off normal knitting. Not quite twice as many rows, but closer than you might think. That’s a lot of extra knitting. And when you’re shaping things like set in sleeves and collars and even just sleeve decreases it can really mess with your mind. Suffice to say I have reknit more of this jumper more times than I care to think about. In addition to which the massively increased yarn consumption meant I had to order an extra ball.
No, I’m not telling which bit was knit in a different dye lot, because unless you know you won’t notice!
The long and the short of it is that I did not hit the March deadline. The deadline was then bumped to August, because we normally go camping in August and need nice, thick, warm jumpers. But the pandemic happened, and August came and went with no camping trip and no finished jumper (which I think was on the naughty step at the time and we had a heatwave).
By the time it was six months late (I know) the weather was on the turn and I was desperate to finish it. So I finally pulled myself together, and Got. It. Done. Fortunately I blocked it before adding the zip, because this yarn grows when it gets washed.
Also fortunately, she loves it!
(Next time maybe I’ll just let her buy one… Nah!)



Leave a Reply