Stove rebuilt

Posted in

Moving on with the story of the stove. We cleared out the fireplace and got it swept, so at the end of the last post on this we were back to brick on the bottom half of the wall. I know a brick chimney in a living room could be a feature and all, but the bricks weren’t particularly pretty ones and besides, then we’d have to take the plaster off the top half of the wall too, so we decided to replaster the bottom half. Oh, and render round the back of the firebox, because apparently plaster can explode. Nice.

We thought we’d get it all done by a professional. With plastering and rendering supposedly difficult and all. But we either got over-the-phone quotes around £250, or no-shows for them coming to give us quotes. Clearly the job was too small and inconsequential for a pro. So GG, being the amazing and determined person she is, decided that… well… it couldn’t be that hard, surely? She’d watched someone once, after all.

We started with the render, and filling the hole in the floor.

rerendered

Why yes, we were looking for a slightly rustic look. How did you guess? It’s harder than it looks. And besides, that covers the gas pipe in the corner and the old pipes to the backboiler, so it’s done it’s job. And I like it that way.

fire 06 first plaster

The first coat of plaster was also somewhat rustic. We tried to convince ourselves that that was also ok with us, but some friends of mine visited and were somewhat honest. Particularly about the difference in finish between the top half of the wall and the bottom. So a second coat was called for. Fortunately GG hadn’t actually reached the level of the top half of the wall either, so there was potential.

In the mean time, we started tiling the floor while we were waiting for the plaster to dry.

whole tiles

The red in the firebox was to test how it looked, given that in the rest of the room we have red on the bottom half of the walls. On the chimney we’ve now taken off the rail separating, so it’ll be all one colour. We thought we’d have red around the back of the fire. It’s ok, we thought better of it thanks to my mum’s comments.

And we lived with it like that for a while, because it took a while to build up the strength to attempt a second coat of plaster. And the floor tiles were tough. A hand-powered tile saw was just not cutting it, as it were. So another solution had to be found, and that always takes time. And if we lived with it, it can stay like that here for a bit too.


Comments

2 responses to “Stove rebuilt”

  1. Well, you’ve already gone well beyond the rest of the immediate family when it comes to DIY. I can almost sense Dad coming out in a cold sweat. Do you think Sarah would care to work her magic near the Oval? I’m prepared to cook, clean and provide any cricket tickets if so….and yes, I’m aware that makes me a rubbish younger sibling. Be careful or I’ll bring you more cheese…

  2. martian77 avatar
    martian77

    Fortunately Dad hasn’t seen it since it was still a sooty heap of bricks and rubble! I think Sarah could be persuaded, but perhaps not during cricket season unfortunately. You may have to promise to cook something simple though – and nothing smellier than a medium cheddar!

Leave a Reply

Your email address will not be published. Required fields are marked *